Licensed & insured · Serving Woodstock since 2018

Free estimates · (404) 630-7172

Home » Blog » Deck Resurfacing: When New Boards Are Enough

Deck Resurfacing: When New Boards Are Enough

Weathered timber deck boards

Resurfacing means keeping the structure and replacing the boards and rails. It runs at about half a rebuild, and it is the right answer more often than people expect.

How to tell if the frame will take it

Get underneath with a screwdriver. Push it into the joists at several points, and into the ledger where the deck meets the house. Timber that resists is fine. Timber that takes the blade has gone.

If fewer than a third of the joists are soft and the ledger is sound, resurfacing works.

What gets replaced

Decking, railings, stair treads and all the fixings. What stays is the posts, beams, joists and ledger — everything you do not see.

Timber steps down a slope
Stairs come off with the boards. They wear faster than anything else.

It is also the moment to change material

Since the boards are coming off anyway, resurfacing is the cheapest point to move from timber to composite. The frame does not care which goes on top.

When it is not enough

Posts that move under load, a ledger that has been wet for years, or a deck built without flashing. New boards on any of those is money on top of a problem.

A covered deck with seating
Resurfaced decks last as long as the frame under them.

Deck repair covers what we find. Finished work is on our Facebook page.

Tell us about your project

Estimates are free. Send a few details and photos, and we will get back to you.